Supervision of all Electromechanical(MEP) works for the construction of the shelter which was based on logic, the maximum electrical energy saving, since constructed under bioclimatic rules incorporating all innovative technologies.
So was achieved the goal of maximum power saving, since both the lighting and ventilation – cooling of the common area of 14 acres is achieved exclusively naturally.
As a (corollary or consistency) of environmentally friendly modern construction is that even wastewater those produced by the usage led after secondary treatment in subsurface disposal.

Final project cost:
4.070.000 €

Construction period:
3 years

Completion:
July 2012